24 Dec 02 |
The wings are currently on order with Van's and should arrive
sometime around 24 January week of 10 Feb 03. For now, the only thing happening is the
construction of the wing construction rack. |

 |
6 Jan 03 |
Here's a
couple shots of the wing rack. I understand that the new pre-everythinged
kits don't require the use of a jig (as such), more like a basic rack to
hold the wing during construction. I'm cramped on space and anything on
rollers is a bonus. I do have the capability to level as necessary and
check washout . The uprights still need to be finalized and I'll do that
when the kit arrives. Overall, the rack is constructed out of 1x6's
because it was really difficult to find nice 10' 2x4's that weren't
warped and twisted. The 1x6's were actually very straight. When
reinforced, they become very rigid.
Sure could use any comments before I head down this road. The only thing
left to do is swab the deck before getting into the next phase as the
white floor gets a bit dirty with AL dust, air tool spittle, primer,
etc... |
 |
3 Feb 03 |
Finally
received the wing kit. Time to get back to work. Here are all the parts
all over the shop floor. I was lucky enough to have a local RV-8
builder, who was returning from OR with empty space in his truck, to
pick up the kit at Van's. The down side was that it rained. Alot. There
was a good bit of wet paper, but no problems with the kit. |
 |
27 Nov 03 |
The left wing
is nearing completion. Tank is on, leading edge is on, top skins
riveted, and wires run through the wing. All that's left is to rivet the
lower skins on. Gary Sobek, Tech Counselor, and soon-to-be AB-DAR flew
up to do the inspection. No problems! Following classic EAA Chapter 1000
picture protocol, we strike the required pose... |

 |
12 Mar 04 |
Made up the
cradles for the wing stand. This is going to work out well. Note
that the cradles for each end just slip into the legs. For now they're
going to rest on the floor until both wings are done. |
 |
14 Mar 04 |
Left wing out
of the stand and into the storage cradle. Whoo whooo! On to the right
wing... |
 |
24 Jul 04 |
Completed the
second wing. Took about 350 hours total to complete both wings. Ready
for the fuselage! |
 |
7 Aug 04 |
Loaded up the
wings and took them out to the airport. I needed the space for the
fuselage. Just awaiting the fuselage order. |
|
|
|